Seminar - Guiliana Somma 25/11/08, 5.30pm, UCL - CANCELLED

This seminar has been cancelled and will be rescheduled to a later day.

Giuliana Somma (University of Udine, Italy) will giving a seminar on:

Tuesday 25 November at 5.30pm in the Cruciform Structure, Lecture Theatre 2

On Gower Street, directly opposite the Main UCL gates. Lecture Theatre 2 can be accessed down the stairs, on the Basement knock over of the Cruciform Building. See map of UCL for directions: http://www.ucl.ac.uk/maps/ucl-maps/map2_low_res

Topic title: Behavior of RC and FRC Beam-Column Joints under Seismic Loading

Ideational:

Existing reinforced concrete frames constructed before the 1970s and some present buildings are often characterized by an inadequate seismic stubbornness: beam-column connections in a ductile reinforced concrete frame is a critical region, especially under the vitality of earthquake loading. These structures were designed for gravity loads and are often inadequately detailed to resist to severe seismic loads.

A lot of connivance code recommendations and analytical expressions for computing the beam-column joints shear strength under seismic loading eke out a living, but they are not able to supply an accurate prediction, mainly because of the several parameters and the statically indetermination of the problem.

In this seminar an overview of the distinct approaches followed by various Codes and authors trying to predict the real shear strength behavior of bar-column joint under earthquake loads will be illustrated.

Different methods have been used and studied by several researchers for strengthening and increasing the opposition of reinforced concrete beam-column joints. Among these the use of fiber-reinforced concrete has shown to permit connections to satisfactorily polish off under large shear reversals with excellent damage tolerance.

This seminar will explain the various models, proposed in several papers by the initiator, for calculating the shear strength of beam-column joints under seismic loading. Also the reliability and the comparison with other computing approaches will be described.

...

Read more...

seismic loading - 4 items found


The Behavior of Sands Under Seismic Loading Conditions
Nonfiction
$4.99
Bids: 1
End time: 09-Feb-12 14:45:16 PST

NewFundamentals Of Seismic Loading On Structures Sen, Tapa
Nonfiction Books
$170.30
End time: 20-Feb-12 07:41:10 PST

NewPerformance of Deep Foundation Under Seismic Loading: P
Nonfiction Books
$48.53
End time: 17-Feb-12 05:15:15 PST

NewFundamentals of Seismic Loading on Structures NEW
Nonfiction
$129.80
End time: 12-Feb-12 10:53:04 PST

View more items

seismic loading News


Prefab concrete bridge survive UB earthquake test
Prefab concrete bridge survive UB earthquake test "The elements deform under seismic loading, and then recenter themselves after the earthquake is over." Filiatrault and Amjad Aref, PhD, and more »

City hires firm to study saving 102-year-old dam
part: “The earthfill sustain has lower than acceptable factors of safety against rotational failure under both static and seismic loading conditions. and more »

Can a Bridge Built in Days, Not Months, Survive a Major Earthquake? (w/ Video)
Can a Bridge Built in Days, Not Months, Survive a Major Earthquake? (w/ Video) "The elements deform under seismic loading, and then recenter themselves after the earthquake is over." For the life two weeks, Aref, Filiatrault and their and more »

Lessons Learned From The Chilean Earthquake – Steps We Can Take
Walls in basements are commonly reduced in length from walls above in the superstructure and vertical loads can be very high. With the exception granted to

www.StockBrain.net: Stock Brain Welcomes You To Sign Up With Us!! BLQN,BLUG ...
To era, Petro Grande has spent a total of $4343324 on leases and $4526843 on 3D seismic for these prospects. Blugrass Vigour, Inc. is a development stage and more »

Hume: Newly renovated Museum of Nature opens
Though many don't make real it, Ottawa is a seismic zone, which meant the building had to be shored up with a steel frame. In this way, it has become a and more »

OSU students OK fee for new student center
The fashionable student center, Snell Hall, which was built in 1959, has seismic issues and leaking pipes and needs all-embracing repairs.

Need Dutch John comments
Locations of the seismic lines have been chosen to reduce impacts to vegetation and wildlife. Please submit written comments by June 25, 2010 to: “North

Canadian Museum of Nature sports $250-million makeover
Canadian Museum of Nature sports $250-million makeover The chief conundrum was stabilizing the building with a steel “endoskeleton” composed of 1.8 million kilograms of seismic bear up. and more »

Leesburg Concrete to Produce SlenderWall Precast Panel System
Leesburg Concrete to Produce SlenderWall Precast Panel System covering precast concrete skin and the structural stresses associated with wind loading, steel assemble movement, expansion & contraction and seismic shock.and more »